Concrete Slab & Footing Calculator

Convert slab or footing dimensions to cubic feet, cubic yards, and whole 60 lb or 80 lb bags of premix concrete.

Project measurements

Measurement method
Pour shape
Coverage, supplies, and other prices

Material list

Concrete order volume1.63 cu yd
Net pour volume
40 cu ft
Net pour volume
1.481 cu yd
Concrete with waste
44 cu ft
Concrete with waste
1.63 cu yd
Using 60 lb bags
98 bags
Or using 80 lb bags
74 bags
Lowest priced bag option
Enter a unit price

The bag counts are alternatives. Use the actual bag yield and approved project dimensions. This tool estimates volume only.

Contractor drawing a renovation plan with a pencil and a scale ruler on paper
Photo: Unsplash, free to use.

How much does a concrete slab cost per square foot?

Angi reports $2–$3 per square foot for slab labor. The 120-square-foot bagged-concrete example below costs $3.70 per square foot for concrete alone at the entered price. Thickness, concrete delivery, excavation, reinforcement, and minimum job charges can change the cost of a local quote.

How to measure and calculate

Concrete is priced and ordered by volume. A square-foot measurement tells you about the footprint but leaves out depth, which can change an order dramatically. This calculator converts a rectangular slab or continuous footing into cubic feet and cubic yards, applies the allowance you choose, and shows alternative counts for 60 lb and 80 lb premix. Use the dimensions already specified for the project and confirm the mix you will buy before comparing bags with a ready-mix quote.

  1. Measure the space the concrete will occupy

    For a rectangular slab, use the inside dimensions of the forms rather than the outside edge of the framing lumber. Record length and width in feet and the planned concrete thickness in inches. The space occupied by gravel or another base is a different quantity and belongs in its own material estimate. If the thickness changes, divide the slab into measurable volume sections.

  2. Take off continuous footings by run

    Use each run’s specified length, inside width, and concrete depth. At intersections, count shared volume once. Where widths or depths change, compute the individual rectangular pieces separately. Add the volumes before using the known-volume input. A drain recess, thickened perimeter, or sloped form should be measured separately if it changes the volume.

  3. Use actual field dimensions when available

    Check form size at more than one point and resolve notable differences with whoever specified the pour. A 1 in change in depth has a larger effect across a broad patio than across a small landing. If you have a known total from a drawing or takeoff, confirm whether it is in cubic yards or cubic feet before entering it. Multiply cubic yards by 27 for the known-volume field.

  4. Read the mixed yield rather than the bag weight

    The pounds printed on the front measure dry weight. The yield printed in the technical information tells you how many cubic feet that package produces after mixing. Use the yield for the exact product and size you plan to buy. Different mixes can have different yields at the same bag weight.

Formula

  • Depth (ft) = thickness in inches ÷ 12.
  • Net volume (cu ft) = length × width × depth in feet.
  • Order volume (cu ft) = net volume × (1 + waste ÷ 100). Divide by 27 for cubic yards.
  • Bag count = round up(order cubic feet ÷ mixed yield per bag). Calculate each bag size as a separate option.

Worked example

A 12 × 10 ft slab at 4 in thick contains 40 cu ft, or about 1.48 cu yd. With 10% extra, the target is 44 cu ft, or about 1.63 cu yd. A 60 lb bag yielding 0.45 cu ft gives a 98-bag order, and an 80 lb bag yielding 0.60 cu ft gives a 74-bag order. If the yard gives you a delivery quote, use 1.63 cu yd as the initial request and ask how they round orders and charge for small loads.

Standard U.S. material sizes and coverage

Material or inputSize or coverageWhat to check
US volume conversion1 cu yd = 27 cu ftA cubic yard measures 3 ft on every side.
QUIKRETE Concrete Mix 1101, 60 lbAbout 0.45 cu ftUse the yield on the actual product label.
QUIKRETE Concrete Mix 1101, 80 lbAbout 0.60 cu ftWear and site conditions may affect the amount you must order.

2026 U.S. cost breakdown

ScopeMaterialsProfessional labor
120 sq ft slab with 80 lb bags$3.70/sq ft in an example at $6 per bag$2–$3/sq ft in Angi’s slab labor breakdown

Angi’s 2026 report puts the average slab pour at $5,400, with scope and thickness driving significant variation. The material row is the worked example using a made-up unit price for budgeting practice, not a national bag-price average. It excludes a base, forms, reinforcement, tools, and delivery. A small project may have a minimum labor charge that a simple square-foot rate cannot capture.

Pro tips to save money and avoid waste

Compare delivered concrete with the complete bag order

Price full bags and account for handling, mixer availability, and how fast your crew can place material. Ask your ready-mix supplier about load minimums, short-load charges, and delivery access. When using a delivered price, match the same mix specification and total volume so the comparison is meaningful.

Keep the approved dimensions separate from purchasing waste

Waste covers estimating uncertainty and practical losses. It does not change the designed thickness or the reinforcement plan. If a form or excavation is out of tolerance, have the person responsible for the design or work review it before you place the order.

Frequently asked questions

How many cubic feet are in 1.5 cubic yards?

Multiply by 27. A 1.5 cu yd order has 40.5 cu ft of volume.

Should I add the two bag counts together?

Choose one bag-size option. Each count independently covers the same concrete volume.

How do I handle a footing that is deeper at one end?

Use separate measured sections or a takeoff from the approved design. Use known volume mode after summing the fill volume.

Can this tool specify how deep my footing should be?

It calculates volume from provided dimensions. Use the approved plans and an appropriate local professional for design and site conditions.